
In this guide
The cheapest time to fix a leak is before the pool is finished. A pressure test before plaster and before handover catches problems early.
When to test
- After plumbing, before the deck is poured
- Before plaster
- After fill, before handover
What is tested
Every line on its own, plus the fittings once the pool is full.
The record
A report showing every line passed protects both the builder and the owner.
See pressure testing.



Book a visit